August 28 Update

It’s really starting to take shape inside this week. With interior walls getting sound/fire insulation and exterior walls getting some nice thick R-19 as well. Then the Duragroove went up on the interior walls and ceilings while pine log siding went on the exterior walls to add some character.

The master bedroom with pine logs on the exterior walls and Duragroove on interior walls. Interior walls also got mineral wool insulation for sound/fireproofing.

Plumbing began to get roughed in, but the bad news is that no bathrooms were working this week. Time for a nice lake swim to “shower up” each day along with a porta potty. Hopefully we’ll have working facilities soon.

Shower going in with the Schluter system to make the tile job a bit easier.

Next week Nate and the log crew return to get some stain on the logs. We’ve had Barb at the Paint Bucket in Eagle River working to match up our stain choice on the 100 year old pine logs with the brand new white cedar siding which is no small feat!

T&G Pine to be stained to match the original pine paneling leading from the living room down the hallway to the bedroom.

The formulas for the old pine versus the white cedar will be completely different to account for the age and character of the different woods.
For those playing at home, the old pine logs will get a blend of 50% Sashco Hazelnut Stain and 50% Sashco Chestnut stain that has been tinted with two parts black for every quart.

Then the white cedar siding will get a base coat of tinted Sashco Weathered Wood with a top coat of Sahsco Chestnut. The pine will then closely match the cedar. Fingers crossed.

The Cabin is Naked!- August 3 Update

What a week last week as the Weatherwize crew was on-site to begin removing the old stain and finish from the full pine logs. Remember, these logs are over 100 years old and solid pine. Nate and crew blasted them with some glass media to get them down to the original wood and then they treated some of the problem areas with their borate solution to prevent future rot.

Burning some of the wood, wood shavings, and other items in the foreground with the sun peering through the “Twin Pines.”

Stripping the Logs

So, at this point, the cabin is naked without any finish on the original logs or the new cedar siding.

The cabin stripped of all original stain/color back down to bare logs with the new Andersen windows installed (and moving toward the green, not white windows as well)

They also stained the soffits and fascia board with “Mission Brown” stain which matches the historical and original stain.

View of the back of the cabin with the stripped pine logs on left and the new white cedar siding on right with the stained fascia and soffit trim. Still awaiting the gable end vents to finish things off.

Siding the Garage

Meanwhile, Bob and crew were busy siding the garage with new LP Smartside lap siding and shakes, installing new garage windows, and installing new soffit venting and aluminum fascia trim on the garage.

Garage getting some new LP Smartside, aluminum fasica trim, new continuous aluminum soffit venting and fresh insulated casement windows. All other trim around the door and garage door and windows is also LP Smartside as well.

Installing the Windows

They also began removing the windows from the original cabin, adjusting the openings (which requires a chainsaw and some log “adjustments” and installing the new Andersen Woodwright windows.

Out with the old windows and ready to get framing for the new windows to go in.

Bob, Dan, and Matt also framed in the new basement entry door which went from a piece of plywood door, to a real insulated door. The logs in that area were in really good shape, for not having seen air or light for many years while under the deck(s).

Cleaning out the Attic and Crawl Space

I was also busy in the attic (ugh) getting rid of the last of the cellulose insulation which is now complete!

Attic before
Attic after removing the insulation…

I also began attacking the crawl space under the fireplace room, which was filled with over 3 feet of wood shavings above the ground. Not a fun place to be for someone over 6 feet, but need to clean it out so we can get plastic down and treat the logs under the floor boards with similar borate and other preservatives.

Why would someone just think, “What should I do with these wood shavings? I know, let me fill the crawl space with them…” Well, that is what happened with them being 3 feet deep in some spots. Sucking them right out to the fire pit area. The logs underneath are in good shape.

I also need to use caution as the ceiling for the root cellar is actually UNDER these as well and is made of logs, so I need to tread lightly to not fall through.

Old ductwork piping on top of, yes, 3 feet of wood shavings which basically fill the entire front half of the crawl space. Time to get out the insulation vac contraption for another round!

This week (August 3), we await the new gable vents to arrive from American Vent and Louver who was able to get the exact match of the Andersen Window Forest Green color for them. Once we receive those, we can frame them into the upper openings and get the log siding completed for the Weatherwize crew to return to begin their final prep, cleaning, staining, and sealing.

Week of July 27 Update

It’s going to be an interesting week at the cabin. The log crew is here to begin the blasting process to get the finish off of the 100 year old pine logs. This involves using fine glass media at the right pressure to get the old finish off, without damaging the wood.

They then begin to hand sand down the logs to a finer finish as well as strip out any old caulk, chinking, etc. They also will repair any logs that have signs of rot before they bleach the logs and add some preservatives to help with future decay.

Then, we will replace all windows and trim and the logs and all log siding will get two coats of Sashco stain and a clear coat.

Original cabin with old finish and some white trim removed.
Finish stripped off after blasting, but before any sanding or other work. You are looking at 100 year old pine logs “in the raw.”
Top part showing the logs after blasting. Lower part with original finish and right side with the new cedar log siding.

What a Week!!

What a week it has been up here at the cabin. As I hunkered down to “work from cabin”, the crew has been super busy and things are really beginning to take shape in a visible way. Here are some highlights:

Completed the shingles on the majority of the roof. Just waiting on the new entryway to be completed to wrap up the remainder.

Shingles on porch side of the cabin all completed after the overhead electrical service was buried and overhead feeder pole was removed from the roof.

WE Energies worked on removing the overhead electrical service and burying it underground. Was a bit disconcerting to see a guy with a chainsaw beginning to drop the power pole about 25 feet from where I was sitting and watching. I was hopeful this wasn’t his first rodeo and the pole would fall where he wanted it to go (it did).

A bit of a tip. WE Energies likes it when you bury the feeder line as that means (in theory), less outages, less trees to trim, etc. If your run is 100 feet or less from the main line to your house, you are gold and there isn’t a charge. There is a charge per foot after the 100 feet. But, the charge is less if you tell them you want to “upgrade” your service to the next amperage level. Only downside is that your new pedestal (which you have to buy) is more expensive. But, that cost is offset by the savings. Had we kept the 200A service, our price to bury would have been around $2300. By moving to 320A service, our price to bury was less than $1500 and should we need more power for the future sawmill, heated swimming pool, and indoor, air conditioned tennis courts, we will have it available to us.

WE Energies chopping down the power pole which was used for the overhead power coming into the cabin.

Completed shingles on the garage roof and trimmed out the remainder of the windows (on the log sided part of the cabin)

Began applying the white cedar half log siding from Northern Log Supply (highly recommend them…”For all your log and timber needs, call Daryl at Northern Log Supply”). The crew also began building the new covered entryway.

White Cedar half logs going on. White cedar is great for taking stain better than red cedar and has better rot resistance. These will be pressure washed to remove the mill glaze, dried, and then will get two coats of Sashco stain and Sashco semi-gloss clear coat.
Logs going onto the back side of the cabin along with the beginnings of the new covered entryway. That will receive some full log columns and cross bar and some Trex decking. Footings were poured for the columns when the stone wall footings were poured.

Nate Demers (Weatherwize), our “log guy” will be onsite with his crew beginning July 27, for three weeks to begin the log blasting, cleaning, staining, sealing, and chinking process. He dropped off the “blast” trailer which is what they will use when they media blast the existing full logs to remove all of the old stain and get them down to bare wood to begin their process.

The Blast Trailer now onsite to begin blasting the logs to remove the finish in a few weeks.

And our cool finds of the week were from a group of avid can and bottle collectors who were onsite to check out the landscape for old cans and bottles. Being a resort from the 1920s, they found some cool cans and bottles such as a 1930 Miller High Life “Girl in the Moon” can and a 1930s PBR can as well. The coolest find was buried in the hill behind the garage which were the remnants of the old wooden row boats that the resort made available to its guests. To my surprise, the side of the boat was reasonably intact and still had a DNR registration sticker (expiring in 1972) with Bernard Otterpohl’s name on it. He was the father of Willie, Sam, and the other 8 kids who lived in this very cabin while running the Otterpohl Resort.

Remnants of the wooden boats that were made available to resort guests. The registration numbers are somewhat visible.
Original DNR Registration Certificate from the wooden boat. Typo in the last name as should have been Otterpohl.

On tap for next week:

  • Finish the entryway over the side entrance area
  • Finish the roofing on the new entryway
  • Keep on siding
  • Await the arrival of our cool and new Duragroove interior pine T&G paneling. More on why we chose this and where it will be installed in a future post.
  • Get everything prepped and ready for the log crew to be onsite soon!

Week of July 6th Update

What a few weeks it has been at the good ol’ cabin. Here is a summary of what has been done and what is coming up:

  • All of the shingles have been removed from the roof
  • Brand new Andersen Woodwright windows have gone in around the “new” area
  • The lower 4 feet of roof decking (and more in some spots) has been completely removed and replaced along with rafter tails, ledger boards, and more.
  • We sucked out over 900 cubic feet of the crappy and dirty and compressed cellulose insulation. More on that in another post and how we hacked together our “insulation vacuum” for under $200.
  • I sweated out more than my body weight, spending hour after hour in the attic getting rid of insulation, dust, dirt and more.
  • We added underlayment and ice and water shield over the entire roof decking area.
  • Began replacement of the upper sheathing and also adding gable vents in place of the previous windows.
  • Said HI to a friendly bat who is living in the attic
  • Took over 4500 pounds of shingles away as well as the rest of the attic “treasures.”
New windows in, roof ready for shingles. A new entryway roof will be constructed over the door.
Sucking out all of the insulation right down to the boards
Filled up six of these 4’x12′ bags full of the old cellulose insulation
Porch and cabin roof ready for shingles

Week of June 22 Update

A big week ahead at the cabin with a lot of activity. Monday saw the Pex tubing get installed for radiant heat in the newly remodeled area. These were installed over Ecowarm subfloor boards. The Ecowarm panels are fully coated with aluminum as the top layer and notched for the Pex. The aluminum helps to reflect and radiate the heat from the tubes into the room versus back down into the subfloor.

Roofing begins this week with fresh decking on almost the entire lower four feet of the roof go replace the rotted wood. New Grace ice and water shield on the lower 6 feet and in all valleys will go in as will new ridge vents. Landmark Pro shingles (hunter green) will go on as well.

Our beloved (and damn expensive) Andersen Woodwright windows arrive this week to begin being installed. We chose these for their design and materials which gives us some degree of maintenance-free living and they come as close as we can get to the look of the original windows.

Appliances come (a bit early…more on that later) later in the week as well to be stored for now until we are ready. They are the GE Cafe line in matte black to continue the dark iron theme of some of the interior items.

Also, thanks to You Tube, we have fashioned up our own system to vacuum out the old insulation from the attic before we blow in some new fiberglass everywhere.

Week of June 15- Progress Update

A lot of activity going on this week!

Willie and crew did a great job finishing up the stone wall. He will be back once some new concrete gets poured and the logs get restored to rebuild the stone wall by the front door.

Willie Otterpohl and crew did a great job on the new stone wall. All full rocks, not the veneer stone that is commonly used in most construction today.

The entire living room wall came out. It had a bay window that was about to fall apart and and old bookcase (inside) that covered an old entryway. The living room was actually the dining room for the resort guests at one time. The entry way was how the resort guests entered without needing to go through the fireplace room or other entrances. Unfortunately, the water damage to the wall and window were too much, so fresh lumber went in.

The new wall is already framed out for about 9 feet of fresh windows to go in. The new windows will be centered on that wall, versus the bay window which was pushed to one side, due to the entryway (no longer used) that was there.

Remnants of the living room wall in front and fresh wall (covered by Tyvek) in back. New wall will have about 9 feet of windows.

The existing bathroom is also being partially demolished this week due to water damage. The roofline and side wall will be rebuilt to get rid of a weird jog in the wall and also to build a properly pitched roof on the bathroom. So, we will actually get more height for a future shower and an additional foot of width with the change. Also, a properly pitched roof will help to avoid future water damage.

The last of the old walls come down. Water damage and the need to better construct and pitch the roof over the bathroom were the main reasons to tear this apart.

Also being built is a cricket behind the existing fireplace chimney to divert water away from the masonry and flashing versus today, where the roof (and water) just go right into the chimney flashing, which is not a good thing.

After that, roofing begins big time with old shingles coming off, ridge vents going in, and Grace ice and water going down before new Landmark Pro shingles (Hunter Green in color) go on.

Week of June 8- Progress Update

It was a busy week at the cabin with a ton of progress. Here is a recap of the week’s activities:

Demolished the two masonry chimneys. One was for the boiler and an old wood burning stove in the basement and the other was at one time used for the stove in the kitchen. Unfortunately, the boiler chimney was right in the way of where the new hallway will be placed and we did not want or need the maintenance of a masonry chimney. It will be replaced with a stainless steel stack for the boiler.

Remnants of the two masonry chimneys that were removed. Interior brick was all stamped with “Duck Creek”

We laid down the Ecowarm subfloor paneling in the new bedroom, master bath, closet, and mudroom areas. The unique panels combine multi-layer plywood with an aluminum coating on the top and are pre-notched for laying down the Pex radiant heat tubes.

Ecowarm Floor panels which are 1.5″ thick with multi-layer wood and aluminum top layer and pre cut for straight and loop sections of Pex to be installed for radiant heat.

Began the new stone wall around the front and former bait shop side. We are using full stones for this to make sure it matches up with the stone wall that made its way about 1/2 of the way around the front of the cabin. Willie and crew also took apart of the stone wall on the main concrete slab by the front door, so the slab can be re-poured and pitched properly. Once Nate refinishes the logs behind where that wall was, then we will have Willie rebuild the stone wall there with pins going in to the logs to keep everything from shifting around.

New footings poured and new full stone wall going in to match up to the stone wall already in place. This will also keep rain from splashing onto the new cedar log siding that will be going up.

Our cabinet maker, Scott Peterson and his wife stopped up to do some final measurements in both the kitchen and laundry rooms to update the cabinet, locker, and countertop plans.

Electrical work with a new pedestal being installed for the upcoming burial of our service line and installation of a full house transfer switch to be connected to a new Generac Standby Generator (once grading is done). This will run on LP and probably a separate LP tank than the rest of the house and will give us some peace of mind as we have already lost power 8 times in 8 months. See more about the generator setup in a post coming soon.

New electrical pedestal going in as we are going to bury the incoming electrical service.

Burying the electrical lines coming in will help us in four ways:

  • No more pipe going through the roof for the overhead wires. That means one less “hole” in our roof.
  • We can relocate the meter from the side of the house (currently) to the pedestal at around ground level.
  • No more pole and cable in the yard where the lines currently come in and make a jog.
  • Less chance of the many trees casting a branch into the overhead lines.

Key WE Energies tip. When asking to get your lines buried, it is always good to plan for the future and ask for “upgraded” service in terms of the amps supplied. We are moving from a 200A feeder line to a 320A feeder line. We may not use it all, but it is actually cheaper to “upgrade” your line as then WE Energies picks up more of the expense. Our cost to bury is actually $600 less by upgrading to 320A service coming in.

Up for Next Week:

  • Pex tubing, radiant manifolds, and stainless chimney stack go in
  • Complete the stonework on the bait shop wall
  • Begin construction of the mud room entry way and the cricket to go behind the masonry fireplace chimney
  • Begin tearing off the current shingles, add ridge venting, lay down the Grace Ice and Water shield, and begin shingles!