The cabin went into winter with all systems firing. The EdgeMelt Ice Dam system was wired up (with over 100A of electrical circuits driving things) and it worked wonderfully to keep gutters clear and any ice from forming on the edges of the roof.
The garage got a ChargePoint EV charger for the new Rivian R1T electric truck. We can say that perhaps this is the oldest log cabin to have a 60A EV charger in it up in the Northwoods!
Still a few odds and ends to work on like some cabinets to install in the bathroom and a ton of basement wiring along with some added garage wiring and lights, but closing in on that elusive last 5% of things.