With summer well underway, we are getting a ton of outdoor work done to hopefully wrap things up soon!

Landscaping and grading has begun again with river rock going in along the sides of the cabin, small rock borders going in, and a ton of fill being used to even things out.

Then driveway gravel goes in as well. We are narrowing the driveway a ton to begin to cut down on the sight line from the road and also adding a parking pad for trailers next to the garage.

A small deck was added off the porch door as well (Trex Spiced Rum decking). Yes, I know, it’s not real wood, but any advantage we can get with maintenance, we will take!

Small things inside included the stone backsplash above the stove, fully painting all basement walls with waterproofing paint, addition of crawl space fans (with humidity controls) and a similar exhaust fan for the basement that is temperature and humidity controlled.

The Ice Dam system from EdgeMelt goes into place in a few weeks to get ready for the winter and our punch list continues.