It’s been a bit since the last update, but we’ve been chipping away and making progress for sure! So, what has happened in the last month or so?

Laundry and Mud Room Are Done
If you may remember the old “Bait Shop” was becoming the new side entry way into a combined mud and laundry room. With some tile going down, counters installed, sink installed and faucet in, the room is really taking shape.

Mud and Laundry Room

After the mud room came the master bath, complete with a new vanity, mirror, lighting, tile shower, and wood-look tile floor. It came together really well with attempting to use modern materials with an older/rustic look to things. The copper sink and old-school water pump style faucet helped as did the cast iron black shower fixtures and concrete look tile.

Master Bath
Master Bath

Master BR and Other Areas

We continued to work on the completing the trim and electrical and plumbing in other areas as well. Things are coming together and we should have kitchen cabinet frames in soon along with appliances.

Bait Shop becomes Mud and Laundry Room