A lot of activity going on this week!
Willie and crew did a great job finishing up the stone wall. He will be back once some new concrete gets poured and the logs get restored to rebuild the stone wall by the front door.
The entire living room wall came out. It had a bay window that was about to fall apart and and old bookcase (inside) that covered an old entryway. The living room was actually the dining room for the resort guests at one time. The entry way was how the resort guests entered without needing to go through the fireplace room or other entrances. Unfortunately, the water damage to the wall and window were too much, so fresh lumber went in.
The new wall is already framed out for about 9 feet of fresh windows to go in. The new windows will be centered on that wall, versus the bay window which was pushed to one side, due to the entryway (no longer used) that was there.
The existing bathroom is also being partially demolished this week due to water damage. The roofline and side wall will be rebuilt to get rid of a weird jog in the wall and also to build a properly pitched roof on the bathroom. So, we will actually get more height for a future shower and an additional foot of width with the change. Also, a properly pitched roof will help to avoid future water damage.
Also being built is a cricket behind the existing fireplace chimney to divert water away from the masonry and flashing versus today, where the roof (and water) just go right into the chimney flashing, which is not a good thing.
After that, roofing begins big time with old shingles coming off, ridge vents going in, and Grace ice and water going down before new Landmark Pro shingles (Hunter Green in color) go on.